Downtown Fairview, OK
Roof Replacement, TPO system
This project was conducted during weekend hours to accommodate downtown traffic. The project involved filling the R-panels with EPS, installing 1 1/2" poly ISO, and fully adhering the roof with a sprayable bonding adhesive. The result was terminations that maintained the historic aesthetic outside, an energy-efficient roofing system, and no unnecessary tear-off in a busy location.