Scope of Work
Flat Roof Replacement, HVAC Curb Installation, Reconfiguration of Roof-top Plumbing, Tapered Insulation Package
Description
This project was a full re-roof of the flat roofed areas on campus. Massive water infiltration had occurred on the prior roofing system leading to much of the steel deck needing to be replaced. Next Phase determined that the old roof had a flat deck with no pitch. A tapered roofing system was designed that efficiently moves water off the roof and to the newly designed guttering. This roof went from no insulation to an R-30 above roof-deck insulation saving thousands on energy bills. This project was entirely conducted while school was in session. Next Phase coordinated with classrooms each day to move children out while the section was safely completed, and had no days or sessions of missed school.
Inspired by what you see?
Contact us to explore how we can deliver similar results for your building.








